East Africa

Rwanda not opting out of Northern Corridor SGR project – Govt


Rwanda Minister Finance

Studies conducted by the East African Community (EAC) indicate that the Tanzanian railway route would cost Rwanda about US$800 to $900 million dollars, while the Kenyan one would cost US$1 billion.

“We do not favour one route over the other because we see both the Northern and Central corridors as critical in cutting transport costs and facilitating trade to and from the ports of Mombasa and Dar-es-Salaam,” added the minister.

“We intend to have access to both routes by railway. Nothing has changed and that decision still holds.”

In June 2013, the first infrastructure summit of the Heads of State of Kenya, Rwanda and Uganda, held in Kampala, agreed to construct a Standard Gauge Railway (SGR) system linking Rwanda and Uganda to the port of Mombasa to enable faster socio-economic transformation of the East and Central Africa economies.

The project was estimated to cost $13 billion.

New Times.

Theinsider Uganda is a news publishing website. We are located at Suite G25 Metroplex Shopping mall, Naalya Kampala Uganda. info@theinsider.ug
Enter ad code here

Copyright © 2016 Theinsider Uganda. Unearthing the truth

To Top